Weed Airport Taxiway and Apron Reconstruction Project- Phase 1, Yreka, CA

Owner Reference
FAA AIG No. 3-06-0274-017-2023 and 3-06-0274-018-2023
Bid Date
Apr 26, 2023 at 12:00pm
Pre-Bid
Scheduled - 4/12/2023 @ 12:00pm @ (for location please or )
Owner
County of Siskiyou CA
Trades
A - General Engineering Contractor GEC; Subcontractor Opportunities, C12 - Earthwork and Paving Contractor, Land Clearing: General Engineering Contractor, C8 - Concrete Contractor: CIP Concrete, Pedestrian Improvements, Sidewalks, Curbs Gutters, Driveways & Handicap ADA Ramps NIGP 913-47

Description

The Contractor shall provide unit prices for both the base bid. The Construction of the Taxiway and Apron Reconstruction Project – Phase 1 includes two (2) base bid schedules and two bid alternates as follows: Base Bid Schedules I and II include the pulverization of the existing asphalt taxiways and aprons, earthwork and grading operations, pulverizing the existing pavement section, subgrade preparation, re-use of the pulverized material as recycled asphalt aggregate base, asphalt concrete, installation of storm drain pipe and facilities, pavement markings, and installation of airfield electrical facilities. DBE goal is 3%. The Contractor shall achieve Substantial Completion of the work (as defined in the General Conditions and evidenced by a Certificate of Substantial Completion) not later than 5 calendar days from the date of the official notice to proceed. Final Completion of the work shall occur not more than five (5) calendar days after the Substantial Completion date. Questions submitted to Owner.

Bonds required. Prevailing wages.

Contact

CBS ID: 665778 | Published 4/7/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.