Laguna Treatment Plant Annex Boiler 1 & 2 Replacements, Santa Rosa, CA
- Bid Date
- Jul 22, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 7/14/2026 @ 02:00pm @ (for location please or )
- Owner
- City of Santa Rosa, CA
- Trades
- C4 - Boiler Hot Water Steam Fitting Installation Contractor and Controls (may include solar), C36 - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The project focuses on replacing the boiler system in the LTP Annex building. Heated water is generated from the LTP Combined Heat & Power (CHP) engines and conveyed to the primary treatment anaerobic digesters. Two existing gas-fired boilers located in the Annex building serve as a backup process heat supply when the CHP engines are offline. Initially installed in the mid-1990s, both boilers have reached the end of their effective service life and are not equipped with modern air emission controls
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 831490 | Published 7/2/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208