This posting has been archived
Hedstrom Road Rehabilitation, Turlock, CA
- Owner Reference
- 20-031 / STPL-5165 (098)
- Bid Date
- Mar 17, 2022 at 02:00pm
- Pre-Bid
- Scheduled - 3/8/2022 @ 02:00PM @ (for location please or )
- Estimate
- $942,000.00
- Owner
- City of Turlock CA
- Trades
- A - General Engineering Contractor GEC
Description
The work consists, in general of: remove existing improvements, install access ramps, storm drain improvements, pavement preservation, hot mix asphalt, striping and signage, fire hydrant, and other associated work. The work on this project, including all punch list items, shall be completed on or before the expiration of Seventy (70) working days. DBE Contract Goal: 14%
Bonds required. Prevailing wages.
Contact
- Randall Jones
- (209) 668-6021
- [email protected]
CBS ID: 619607 | Published 2/24/2022 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.