This posting has been archived
#590015
•
Posted 6/10/2021
El Rio Iron and Manganese Treatment Plant Phase 1, Oxnard, CA
- Owner Reference
- 20-03
- Bid Date
- Jun 22, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 6/2/2021 @ 10:00am @ (for location please or )
- Estimate
- $8.9 M
- Owner
- United Water Conservation District
Description
Installation of engineered fill and associated grading and site work, construction of a five (5) million gallon per day (MGD) iron and manganese treatment facility with horizontal pressure filters, chlorine system modifications, air scour system, washwater recovery tank, filter drain pump station, washwater recovery pump station, waste solids pump station, appurtenant building with a laboratory, yard piping and associated vaults, electrical, instrumentation, programming, testing and startup.
Contact
- Adrian Quiroz
- (805) 210-8294
- [email protected]
CBS ID: 590015 | Published 6/10/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.