Sewer Rehabilitation Project, Windsor, CO
- Owner Reference
- PS - 26 - 013
- Bid Date
- Jun 26, 2026 at 12:00pm
- Questions Due By
- 06/12/2026 12:00 PM
- Pre-Bid
- MANDATORY - 6/9/2026 @ 02:00pm @ (for location please or )
- Owner
- Town of Windsor, CO
- Trades
- Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF), CO-01 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The work generally consists of the trenchless rehabilitation and relining of existing sanitary sewer and stormwater pipelines utilizing fiberglass reinforced ultraviolet (UV) cured-in-place pipe (CIPP) lining or steam-cured CIPP lining methods, including all necessary cleaning, preparation, bypass pumping, traffic control, testing, reinstatement, permitting, and restoration required for a complete and operational installation.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 827300 | Published 6/3/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208