Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#831744 Posted 7/5/2026

Peru, IL - Area 2, Phase 2 Combined Sewer Separation with Addendum 1, Peru, IL

Bid Date
Jul 10, 2026 at 10:00am
Pre-Bid
Scheduled, Optional - 6/16/2026 @ 10:00am @ (for location please or )
Estimate
$1,302,858
Owner
Chamlin & Associates Peru, IL
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The project is primarily intended to separate storm inlets from the existing limits. As part of this work, certain sections of existing clay or concrete sanitary sewers will be replaced with PVC pipe either due to the deteriorated condition of the sanitary sewer or as required to meet water and sewer separation requirements.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 831744 | Published 7/5/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208