Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#822547 Posted 5/5/2026

Arena High-Performance Resinous Flooring Installation, Hoffman Estates, IL

Bid Date
Jun 1, 2026 at 10:00am
Pre-Bid
MANDATORY - 5/8/2026 @ 01:00pm @ (for location please or )
Owner
Village of Hoffman Estates
Trades
Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The primary objective of this project is to ensure a safe, durable, and maintenance friendly floor coating system. This project will require the use of two specific Resinous Flooring systems. The NOW Arena has a freezer and coolers that benefit from the use of a Methyl-methacrylate Based Self-leveling Flooring System, and the remaining concessions and kitchen spaces will be finished in a Cementitious Urethane Self-leveling Flooring System. Each of these systems is more robust and suitable for the commercial environment at the NOW Arena than the existing Epoxy Systems.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 822547 | Published 5/5/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208