2026 Sodding Program, LIsle, IL
- Owner Reference
- 1430
- Bid Date
- Jun 2, 2026 at 10:30am
- Owner
- Village of Lisle, IL
- Trades
- *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Furnish and Install Topsoil A. The majority of the ditch regrading done will only be rough grade; the finish grade will be provided to the Contractor. The Contractor will be required to furnish and install topsoil for the establishment of a finished grade prior to sodding (when installing topsoil, a minimum of 4" will be required). Furnish and Install Sod A. Sod shall be placed only on those areas which have an acceptable finish grade. Sod shall be placed tightly and smoothly edge-to-edge with staggered joints. The sod shall be immediately pressed into contact with the bed by rolling with approved equipment. The edges of the existing parkway shall be cut with a sod cutter such that the newly laid sod meets the grade of the existing turf flush and smooth.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825496 | Published 5/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208