IL RTE 23 Sewer & Water Extension Phase II, Marengo, IL
- Owner Reference
- 10217520
- Bid Date
- Jun 30, 2026 at 10:00am
- Pre-Bid
- Encouraged - 6/17/2026 @ 10:00am @ (for location please or )
- Owner
- City of Marengo, IL
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Public Utilities, Water, Sewer & Gas Repairs NIGP 910-63, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
This project consists of the extension of public sanitary sewer and water main along IL Route 23 and Anthony Road in the City of Marengo. Specifically, the scope of work includes approximately 2.2 miles of 12-inch diameter water main, 1.2 mile of 8-inch diameter sanitary force main, lift station, along with other ancillary improvements, and road resurfacing. Open-cut and horizontal directional drilling installations shall be allowed at certain locations and for certain improvements.
Contact
- or to view contact name.
- or to view phone number.
Plans & Specifications
or to view plans and specification details.
CBS ID: 828450 | Published 6/10/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208