2026 Asphalt Project, Moline, IL
- Owner Reference
- 26-00000-01-GM
- Bid Date
- May 19, 2026 at 11:00am
- Owner
- City of Moline
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- The Contractor will have 35 working days to complete all work.
Description
The project location is 16th Avenue from the Rock Island border to 7th Street. Work includes milling and resurfacing with 3" of Polymer Hot Mix Asphalt. Work also includes concrete patching, sidewalk replacements, ADA ramp installations, utility adjustments, pavement markings, traffic control, and landscaping.
Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 823109 | Published 5/8/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208