Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Tazewell County, IL

#825546

Bridge and Roadway Improvements - FAP Route 317 & FAU Route 6717 (US 24, BUS 24, IL 8) - Tazewell County, Springfield, IL

The project includes partial depth patching, milling, resurfacing, bridge deck overlay, bridge joint replacements, bridge approach roadway improvements, and related collateral work necessary to complete the project. Location: This project is located on Business Route 24 and Illinois Route 8 (McClugage Road) from US Route 24 to Illinois Route 8 (Washington Road) in Washington, Illinois in Tazewell County

Post Date: 05/22/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#825549

Resurface IL 98 from IL 29 to 0.2 mile East of Parkway Drive in Tazewell County, Springfield, IL

This project consists of design overlay and other related collateral work necessary to complete the work in the plans and as described herein. Location: This project is located on Illinois Route 98 from Illinois Route 29 to 0.2 mile east of Parkway Drive in Tazewell County.

Post Date: 05/22/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#825560

Resurfacing McMullen Rd and IL 122 from west of I-155 to 2.1 miles east of Hopedale, Tazewell County, Springfield, IL

This project consists of Class D patching, milling and resurfacing, cold-in-place recycling, pavement marking and other related collateral work necessary to complete the project. Location: This project is located on McMullen Road/Illinois Route 122 from West of Interstate 155 to 2.1 miles East of Hopedale in Tazewell County.

Post Date: 05/22/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#827132

HMA Patching on Morton Ave from north of Clark St to Jackson St (US 150) in Morton, Springfield, IL

This project consists of hot-mix asphalt partial depth patching and modified urethane pavement markings on Morton Avenue and all related collateral work necessary to complete the project as shown in the contract plans as described herein. Location: This project is located on Morton Avenue (FAU 6729) in Morton, Illinois in Tazewell County. The job begins at the intersection of Clark Street to West Jackson Street (US Route 150).

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#825516

Lecture Recital Hall A/V & Lighting Equipment , East Peoria, IL

Lecture Recital Hall A/V & Lighting Equipment for Illinois Central College, IL

Post Date: 05/22/2026 Bid Date: 06/02/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Audio/Visual (AV) Contractor: Video Conferencing, Sound & Speakers, Cameras, Intercom, CATV, Public Address (PA) System, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines