Resurfacing BUS 67 from 0.5 mi. S. of 90th Ave., N. of Roseville to 0.4 mi. S. of 60th Ave., S. of Roseville, Springfield, IL
- Owner Reference
- 68K21
- Bid Date
- Jun 12, 2026 at 12:00pm
- Owner
- State of Illinois Department of Transportation (ILDOT), IL
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Contracted Services & Suppliers
Description
This project is approximately 2.8 miles in length and consists of the following improvements: Partial depth patching, hot-mix asphalt surface (HMA) removal and resurfacing (1.5 inches), ADA improvements at the intersections of BUS 67 at Illinois Route 116 and Business 67 at Gossett Street along with other various locations, and other related collateral work necessary to complete the project as shown in the plans and as described herein. Location: This project is located on Business Route 67 (BUS 67) from 0.5 mile South of 90th Avenue North of Roseville to 0.4 mile South of 60th Avenue South of Roseville in Warren County
Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825569 | Published 5/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208