Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#825410 Posted 5/22/2026

Furnishing and installing landscaping along I-80 corridor from Gardner Street to Gouger Road, Springfield, IL

Owner Reference
62X37
Bid Date
Jun 12, 2026 at 12:00pm
Owner
State of Illinois Department of Transportation (ILDOT), IL
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
Phase
Contracted Services & Suppliers

Description

This work shall consist of restoring compacted soils and soils that have lost their structure and ability to sustain plant growth. Soil Decompaction serves as a viable method for restoring soil conditions in areas where the topsoil layer has been fully removed and the underlying subsoil has become compacted due to vehicular activity or previous land use activities. Soil decompaction is intended to restore the soil structure and condition to make it more suitable for plant growth. Amendments to the soil may need to be made in addition to the decompaction works if issues are identified following soil testing. Soil decompaction should not be applied within the root zones of trees that are to be retained and protected as it is very invasive and will cause irreversible damage to the tree roots. The decompaction work involves subsoil preparation, incorporation of organic material into the subsoils (compost, peat, etc.), incorporation of additional topsoil into subsoils, and regrading the area to appropriate compaction levels for plant material installation.

Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 825410 | Published 5/22/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208