Summary of Work Description: 1. Tree Preservation 2. Removal and Demolition 3. Site Preparation 4. Storm Drainage & French Frain 5. Sod/Seed Restoration & Sod/ Seed installation 6. Landscape Mulching 7. Concrete work 8. Drainage Stone Base/Grading
Post Date: 05/20/2026Bid Date:05/28/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, Prefabricated Buildings, Mobile Homes, Playgrounds, Trailers, Modular Units, Offices, Classrooms, Portable Toilets
Photovoltaic Inverter Placement Project. Description: 1. Removal and Demolition 2. PV Inverter Replacement. Furnish, install and maintain temporary facilities and controls required for construction; remove on completion of work.
Post Date: 05/20/2026Bid Date:06/02/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Solar Photovoltaic (Solar PV) Thermal / Electrical Contractor, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
This work consists of removing existing village signage within the the median of IL Route 59, furnish and installation of 9 foot tall by 12 foot wide village welcome sign, landscaping, sign lighting, and erosion control.
Post Date: 05/22/2026Bid Date:06/05/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi
These specifications include requirements for all planning, design, deployment, materials, transportation, equipment, and labor necessary to complete the leak detection and location services. The water system includes approximately 140 miles of watermain and approximately 2,200 hydrants (full system) consisting predominantly of cast iron and ductile iron main. The scope includes a minimum of two (2) full system Leak Detection Surveys (generally one in the Spring/Summer and one in the Fall/early Winter) approximately six (6) months apart. Each survey shall include complete leak detection and location survey of the full system using sonic detection to listen on all hydrants and strategic main line valves and selected B-Box service valves using sensitive sound intensifying instruments. If a leak is suspected, the location will be further investigated with an electronic correlator and ground microphone to pinpoint the exact leak location. The leak location shall be marked with blue paint. The contractor shall record all defective system components found during the surveys such as hydrants, valves and b-boxs as well as any map errors that are noted during the course of the surveys.
Post Date: 06/04/2026Bid Date:06/09/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic