Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#731809 Posted 11/21/2024

BID DATE CHANGE - IND Terminal Energy Resilience BP#1 Early Equipment Package, Indianapolis IN

Owner Reference
IAA Project 1-24-003
Bid Date
Dec 10, 2024 at 03:00pm
Pre-Bid
Scheduled - 11/12/2024 @ 02:00pm @ (for location please or )
Owner
Indianapolis Airport Authority IN
Trades
*General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Phase
New Construction, Addition, Expansion

Description

Each bid shall include all work, labor, equipment and materials necessary to complete the project as required in strict compliance with the drawings and specifications (plans) prepared by Kimley-Horn 500 East 96th St. Suite 300, Indianapolis, IN 46240. Furnish elecrical distribution equipment, furnish BESS and enabling duct bank work (erosion control and landscaping, hauling, quality control, survey, sweeper, directional bord , hydro excavation and sawcut.) MBE (15%), WBE (10%), VBE (10%) goals apply

Bonds required. Prevailing wages.

Contact

  • Mark Schuette

CBS ID: 731809 | Published 11/21/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.