Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#831810 Posted 7/5/2026

Re-Bid - Stoner Avenue Bridge Rehabilitation , Shreveport, LA

Owner Reference
26-037
Bid Date
Jul 28, 2026 at 02:00pm
Pre-Bid
Encouraged - 7/10/2026 @ 10:00am @ (for location please or )
Owner
City of Shreveport, LA
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction
Phase
Renovation, Remodel, Improvements, Upgrades

Description

This project entails the rehabilitation of the Stoner Avenue over Line Avenue bridge. This work includes but is not limited to, removal and replacement of bridge bearings, approach slabs, and other structural components of the bridge. Additionally, improvements to the driving surface of the bridge deck and drainage system will be required. This project is located within City Council District B.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 831810 | Published 7/5/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208