#821829
RFQ CPF Woodtick Trail FR2107 Repairs, Cass Lake, MN
Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. The USFS is pursuing a Purchase Order to provide road repair construction services on the Woodtick Trail in the Walker Ranger District, Chippewa National Forest. Activities include but are not limited to roadway reconditioning, spot graveling, culvert installation, beaver dam removal, and gravel resurfacing. PoP 06/01/2026 to 10/21/2026
Post Date: 04/30/2026
Bid Date:
05/15/2026
Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors