Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#826475 Posted 5/28/2026

Underground Utilities Improvement, Minneapolis Air Route Traffic Control Center (ZMP ARTCC), Farmington, MN

Owner Reference
697DCK-26-R-00267
Bid Date
Jul 2, 2026 at 03:00pm
Owner
US Department of Transportation (FAA), TX
Trades
Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Renovation, Remodel, Improvements, Upgrades

Description

237110 - Water and Sewer Line and Related Structures Construction. Dewatering Performance: Design, furnish, install, test, operate, monitor, and maintain dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 826475 | Published 5/28/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208