2026 Airside Electrical Construction P2, Minneapolis, MN
- Owner Reference
- 237864
- Bid Date
- Jun 17, 2026 at 02:00pm
- Owner
- Metropolitan Airports Commission, MN
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
This project provides for the upgrade of existing runways lights to LED and replacement of runway conductors. The LED light fixture upgrade includes the removal of the existing light and installation of materials furnished by the owner and from a separate contract. Replacement of the conductors includes the removal and installation of new 5kV conductors for the Runway 17-35 circuits at the Minneapolis-St. Paul International Airport.\n\Item description, Quantity, Unit of Measure\Mobilization, 1, LS\Airport Security, 1, LS\Traffic Control, 1, LS\n#8 5kV Cable, 63,000, LF\n#6AWG Cable, 41,000, LF\Runway Lights, 440, EA
Contact
- or to view contact name.
- or to view phone number.
Plans & Specifications
or to view plans and specification details.
CBS ID: 828596 | Published 6/10/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208