Kimberly Marsh WMA Water Control Structure Rebid, Saint Paul, NE
- Owner Reference
- 10217517
- Bid Date
- Jun 11, 2026 at 02:00pm
- Estimate
- $ 96,413.00
- Owner
- Minnesota Department of Natural Resources, MN
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- March 5, 2027
Description
A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Remove Water Control Structures 2. Re-build dike with Clay core 3. RipRap dike for overflow purposes 4. Seed and Mulch all disturbed areas 5. Repair dike from equipment damage.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 828003 | Published 6/8/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208