Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#829316 Posted 6/17/2026

Main Street Improvements - Arcadia Street to Dogwood Drive, Warsaw, MO

Owner Reference
Fed #TAP-9901(461) / ARPA & SLFRP4542 TAP-9901(559)&
Bid Date
Jun 23, 2026 at 02:00pm
Pre-Bid
Scheduled, Optional - 6/16/2026 @ 02:00pm @ (for location please or )
Owner
State of Missouri Department of Transportation (MODOT), MO
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The proposed work for Project A, designed by Great River Engineering, generally includes the following: Grading and Embankment, Concrete Bicycle Lanes, Aggregate Bicycle Lane, Street Lighting, Sidewalks, Asphaltic Pavement Widening and overlay, Aggregate Base, Curb and Gutter, Storm Sewers, Driveways, Pavement Markings, and Signage. The project is located along Main Street between Arcadia Street and Hackberry Street. Arcadia Street to Illinois Street includes construction of an aggregate bicycle lane on the north side of the roadway. Between Illinois Street to Hackberry Street, the project is along both sides of the roadway, and includes full-width asphalt overlay. The full project is approximately 1,360 feet in length. The proposed work for Project B, designed by OWN Engineering, generally includes the following: Construction of a 5 concrete sidewalk and 4 wide concrete bike lane, access connections, storm sewers, curb and gutter, street lighting, asphalt widening, milling and overlay, Pavement Markings, and Signage and any incidental work related thereto, including street improvements within the project area in accordance with the plans and specifications. The project is generally located along the south side of Main St. between Hackberry St. and Dogwood Dr. The total length of improvements is approximately 1,710 feet of sidewalk and 2,140 feet of bike lane.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 829316 | Published 6/17/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208