#829310
E. 310th Road over Brush Creek, Polk County, MO
The proposed work includes: Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NU girder bridge. A precast concrete box culvert, guardrail, riprap, and permanent erosion control will be installed along with any other incidental work in accordance with the plans and specifications.
Post Date: 06/17/2026
Bid Date:
06/22/2026
Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction