#824314
OPS Gomez Heritage Elementary Boiler Replacement, Omaha, NE
Scope of Work: The project involves demolition of an existing boiler system and installation of two new high efficiency hot water boilers with heat exchangers to provide backup heat to an existing ground source heat pump loop, including all required piping, controls, and ducting.
Post Date: 05/16/2026
Bid Date:
06/12/2026
Trades: Boiler Hot Water Steam Fitting Installation Contractor and Controls (may include solar)