Browse all Carson City County, NV

#830667

Evidence Impound Lot Expansion (Department of Public Safety - Training), Carson City, NV

Description: This Project involves expanding the existing evidence impound lot at the Department of Public Safety Training Division. Improvements include installation of site lighting, security cameras, an automatic vehicle gate, and a new carport/work shed structure.

Post Date: 06/27/2026 Bid Date: 07/16/2026 Trades: C2 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C2 - Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), Security System: FOB, Access Control, CCTV, Video Surveillance, Active Threat, Intrusion Alarms (Except Locksmiths) NAICS 561621, Door Service Contractor: Including Bay Doors, Fire Doors, Gates, Activating Devices & Overhead/Garage Door Opener
#830668

Exterior Quad Lighting (Stewart Facility), Carson City, NV

Description: This Project includes trenching, saw-cutting, backfilling, and landscape repair to install new conduit for site pole lighting. It also covers installing wiring for pole lighting and receptacles, as well as modifying the existing Lutron lighting control system to support the new fixtures. Controls will include manual on/off and dimming (raise/lower) overrides located in Building #1.

Post Date: 06/27/2026 Bid Date: 07/23/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C2 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
#827528

Runway Safety Area Grading and Drainage Project, Carson City, NV

Summary: Carson Airport Authority Airport Pavement Preservation Project will remove the stop way and extend the runway 1000 feet to the north and 500 feet to the south. Finally, the existing portion of the runway will be repaved. The runway 33 glide slope will be relocated. The new runway 33 localizer has already been installed by FAA Technical Operations and only needs to be switched on. Runway 15 is currently served only by a localizer, which will remain in operation as it will be beyond the future Runway Safety Area.
Post Date: 06/04/2026 Bid Date: 07/07/2026 Trades: Runway Friction Testing (RFT): Paving/Seal/Chip Testing & Analysis, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales