UMC Summit Tower Floors 1 & 5 Remodel, Las Vegas, NV
- Owner Reference
- 2026-03
- Bid Date
- Jun 26, 2026 at 11:00am
- Pre-Bid
- MANDATORY - 6/9/2026 @ 01:00pm @ (for location please or )
- Owner
- University Medical Center of Southern Nevada / University Medical Center (UMCSN), NV
- Trades
- Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, C2 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, C2 - Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV)
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Scope of Work: This work will primarily take place on floors one (1) (lobby) and five (5) within UMC's Summit Tower, located at 2040 W Charleston Blvd, Las Vegas, NV 89102. As part of the work, there are to be finish updates with minor upgrades to the electrical and low voltage. The refresh work will also include repairing any damaged areas outside of the scope.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 827531 | Published 6/4/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208