Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#827790 Posted 6/7/2026

City of Newburgh Combined Sewer Control Facility Project, Newburgh, NY

Bid Date
Jul 23, 2026 at 11:00am
Questions Due By
07/10 4pm
Owner
City of Newburgh, NY
Trades
GC-1 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF), HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's, EC-1 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, EWC - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, EC-1 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, EWC - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, GWC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, PWC - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , MWC - Mechanical Contractor: MEP Contractors (Combined Mechanical, Electrical, Plumbing, HVAC, Fire Suppression Trades)
Phase
Renovation, Remodel, Improvements, Upgrades

Description

City of Newburgh (Owner) is requesting Bids for the construction of the following Project: Combined Sewer Control Facility The Project includes the following Work: Provision of all labor, materials, equipment, and incidental items to construct a Combined Sewer Control Facility consisting of a screening equipment, flow control equipment, chemical storage and dosing equipment, odor control equipment and associated duct work, chlorine contact tank, outfall sewer, plumbing, HVAC, electrical, SCADA systems, site work. Provision of all labor, materials, equipment, and incidental items to construct an influent sewer that includes a railroad crossing, structural support piers, site work, new concrete energy dissipation structure and associated items. Separate Bids will be received for the following Contracts: Contract No. Description of Contract 1G General Construction 1E Electrical Construction 1P Plumbing Construction 1H HVAC Construction The Project has an expected duration of 730 days. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 827790 | Published 6/7/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208