Water Distribution Pipe Replacement Project-Phase 3, Saratoga Springs, NY
- Owner Reference
- 2026-04
- Bid Date
- May 12, 2026 at 02:00pm
- Owner
- City of Saratoga Springs
- Trades
- Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, GC-1 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The project includes installation of 4,000 lf of water mains along Clinton Street, Carraige House Lane, and Lathrop Avenue. The contractor will provide all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the Water Distribution Pipe Replacement Project - Phase 3
Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
Plans & Specifications
or to view plans and specification details.
CBS ID: 819696 | Published 4/19/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208