Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Knox County, TN

#831352

Red Mill Dam Parking Lot and Trailhead, Farragut, TN

This project includes grading, drainage, base, and paving for the construction of a parking lot and trailhead.

Post Date: 07/01/2026 Bid Date: 07/30/2026 Trades: HC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#825604

Request for Qualifications Comprehensive Land Use Plan Update, Farragut, TN

Bid Date estimated and vendors have until no later than 4/30/2027. The Consultant will be responsible for completing all tasks, deliverables, and final documentation associated with the Plan within twelve (12) months of the start date. The final Comprehensive Land Use Plan, including all required revisions following staff and community review, must be completed and delivered no later than April 30, 2027. The Consultants proposed project schedule shall:

  • Identify major milestones, deliverables, and meetings; Show interim deadlines for draft reports, public engagement activities, and plan development phases; and Ensure adequate time for review by Town staff, the Planning Commission, and the Board of Mayor and Aldermen prior to the final adoption of the Plan.

Extensions to the project timeline will be considered the Town values its comprehensive plan and uses it extensively. As the Town continues to approach a build out of its vacant tracts, the next comprehensive plan will be critical in terms of providing guidance on what the community would like to see. With limited undeveloped land, another component of the next comprehensive plan will be a focus on infill and re-development. The next comprehensive plan will also need to thoroughly examine the transportation network in the Town and determine how to improve efficiency, particularly through its built environment. Key to all of this will be a program for robust community engagement guided by an outside entity. The Board of Mayor and Aldermen allocated money in the Towns budget to pursue this desire. The scope of work that the selected firm will be asked to deliver will include the following: 1. Meeting with the appropriate Town staff and officials to establish an overview of the Town, its critical undeveloped tracts, and to discuss the specifics of the project, and the desired outcomes. 2. Evaluate existing conditions in terms of planned projects (including transportation and park projects), existing land use, currently designated future land use, zoning, public spaces, natural areas, vacant lands, new development and re-development opportunities, and the overall transportation network both within the Town and the immediate vicinity of the Town. 3. Evaluate the market and socio-economic factors to determine what may be possible and/or in demand should it be something the community would want to provide for. 4. Develop and conduct a citizen engagement process with the goal of establishing a clear and realistic vision for desired land use and transportation elements associated with new development and re-development. The citizen engagement process must include components that will maximize desired input. This will involve, at a minimum, in person workshop sessions, surveys, and other forms of outreach coordinated with the appropriate Town staff. 5. Meet with Town staff and potential stakeholders and a steering committee to review public input. 6. Provide recommendations for the new Comprehensive Plan based on the results of the citizen engagement process. 7. Develop a draft of the Comprehensive Plan for additional community input. The Plan should heavily focus on images and illustrations to convey information so that it is easy to understand and follow. 8. Finalize the Comprehensive Plan and establish and prioritize an implementation program for the Town to be working on for the target year 2040 Farragut 2040. This should also include a schedule for periodic evaluation of the Plan and any updates that may be needed.

Post Date: 05/23/2026 Bid Date: 09/23/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#825112

Biddle Farms Washroom Facilities Build, Farragut, TN

The Biddle Farm area is a new area for the Town of Farragut which includes living space, grocery shopping, bank, shops, restaurants, and a fuel station. The restroom is meant to help support the general area, which includes a greenway/trail. The Town also plans to use open green space for future events, and this restroom will help support those functions.

Post Date: 05/20/2026 Bid Date: 06/16/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#826512

Street Resurfacing Projects FY27, Farragut, TN

Prequalified contractors only. The Town of Farragut is seeking to procure a contract for street resurfacing projects for FY27. Bidders must be TDOT prequalified to bid on this project and TDOT ID number listed on the Bid Cover Form.

Post Date: 05/29/2026 Bid Date: 06/24/2026 Trades: HC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#830927

SOURCES SOUGHT 118th Wing Repair Auditorium & 2nd Floor Restroom, Nashville, TN

236220 - Commercial and Institutional Building Construction. The requirement integrates two distinct facility repairs under a single contract: - Repair Auditorium, B747 (Project BKTZ242011): This phase includes selective demolition, raised-floor concrete demolition, partition wall construction, wall and floor finishes (paint, carpet tile), acoustic ceiling, new fixed seating (approximately 147 EA), electrical power and lights, HVAC modifications, AV equipment and cabling, electronic security, and minor fire protection modifications. The approximate project area is 1,600 square feet. All work must meet Department of Defense Unified Facilities Criteria (UFC), including UFC 3-540-01 and UFC 3-50-01. - Repair 2nd Floor Restroom, B747 (Project BKTZ252001): This phase includes demolition and disposal of existing restroom components (partitions, plumbing fixtures, accessories, flooring, and ceiling tiles), new HVAC exhaust fans and ductwork, new plumbing fixtures (water closets, urinals, and lavatories with specified carriers, faucets, and trim), new LED light fixtures, new finishes (gypsum board, ceramic wall and floor tiles, paint, and acoustic ceilings), and new specialties/accessories (partitions, mirrors, grab bars, and soap/paper dispensers). All work must meet UFC 1-200-01 and UFC 3-600-01.
Post Date: 06/29/2026 Bid Date: 07/10/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors