**NEW PRE-BID AND BID DATE**2025 Water Main Replacement Project 5 , San Antonio, TX

Owner Reference
CO-00887-MM
Bid Date
Dec 31, 2026 at 02:00pm
Pre-Bid
Scheduled, Optional - 4/1/2026 @ 02:00PM @ (for location please or )
Estimate
$1.9 million
Owner
San Antonio Water System (SAWS)
Trades
Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Site 1 - Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. About the Project This package has four site locations. Project site one will install approximately 881 feet of 8-inch HDPE water mains by pipe bursting, and 10 feet by open trench construction methods. Project site one includes an alley between Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 2 - Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. About the Project This package has four site locations. Project site two will install approximately 580 feet of 8-inch HDPE water mains by pipe bursting, and 186 feet by open trench construction methods. Project site two includes an alley between Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 3 - Shadylane from E Terra Alta to Forest Glen About the Project This package has four site locations. Project site three will install approximately 997 feet of 8-inch HDPE water mains by open trench construction methods. Project site three includes Shadylane from E Terra Alta to Forest Glen. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 4 - Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd About the Project This package has four site locations. Project site three will install approximately 951 feet of 8-inch HDPE water mains by pipe bursting methods. Project site four includes an alley between Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 803491 | Published 1/12/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208