16" PVC Pipeline from Jolly Road to SH 142, San Antonio
The conclusions and recommendations contained in this report are based on our site visits to the project site and on the soil samples gathered from two borings (W-1 and W-2) performed by BEA on December 23, 2024. The borings were drilled along or within the proposed utility alignment and extended to a termination depth of approximately 10 feet below the existing ground surface elevations. We were requested to drill at two (2) locations deemed accessible to our truck-mounted drilling rig
Post Date: 05/13/2026
Bid Date:
05/19/2026
Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Drilling, Boring, & Blasting Contractor: Horizontal Directional Drilling (HDD), Other Earth Manipulation & Oil Field Work, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors