Wattley Park Stream Bank Stabilization, McKinney, TX
- Owner Reference
- 26-55ITB
- Bid Date
- Jun 4, 2026 at 02:00pm
- Questions Due By
- May 28th 2026, 2:00 PM CDT
- Pre-Bid
- Scheduled, Optional - 5/26/2026 @ 02:00pm @ (for location please or )
- Estimate
- $950,000.00.
- Owner
- City of McKinney, TX
- Trades
- Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sand Bags, Dikes & Embankments, Barriers: Containment/Diversion of Water, Flood Prevention, Land Protection, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
- Phase
- Contracted Services & Suppliers
Description
Wattley Park Stream Bank Stabilization.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825102 | Published 5/20/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208