Utility Improvements for Lakeside Grove, Phase 1, Dallas, TX
- Owner Reference
- NT340-0419
- Bid Date
- Jun 11, 2026 at 01:00pm
- Pre-Bid
- Scheduled, Optional - 6/4/2026 @ 01:00pm @ (for location please or )
- Owner
- GRBK Edgewood LLC, TX
- Trades
- Municipal & Underground Utility Contractor: Subsurface Mapping, Locating Services: Pipes, Power, Telecom, Potholing, Daylight, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Utility Improvements for Lakeside Grove, Phase 1.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
Plans & Specifications
or to view plans and specification details.
CBS ID: 826655 | Published 5/31/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208