Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#823885 Posted 5/13/2026

Central Regional Wastewater System Stage IX Odor Control Improvements, Arlington

Owner Reference
3110.2064
Bid Date
May 19, 2026 at 02:00pm
Pre-Bid
Scheduled, Optional - 3/25/2026 @ 11:00am @ (for location please or )
Estimate
$ 25-30 Million
Owner
Trinity River Authority of Texas, TX
Trades
Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's), *Janitorial, Cleaning, Custodian, Housekeeping, Sanitation, Deodorizing, Window Washing: On-Call & Regular Services, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Tide Gates, Industrial Painting & Coating Contractor: Tanks, Bridges, Corrosion Protection, Limnology & Inland Water Restoration: Reservoirs, Lakes, Streams, Ponds, Rivers, Barriers, Aquatic Plants, Wetlands Living Shore, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The project scope includes the following major items: Construction of four new odor control systems for Pump Station 6 (PS 6), Pump Station 6A (PS 6A), Junction Boxes, 1E and 1F, and Headworks A Grit Basin including foul air duct and supports. Installation of aluminum cover plate at Headworks A Grit Basins effluent channel. Replacement of slide gates at PS 6 and PS 6A and demolition of weir gates at PS 6. Corrosion improvements at PS 6 middle flume and screen channel. Corrosion improvements at Headworks A Grit Basin effluent channel. Coating repairs at replaced and demolished gates at PS 6 and PS 6A. Demolition of existing Biofilters 5 and 6 structures. Demolition of existing Bioscrubbers 4 and 5. Demolition of Scrubber Unit 1 (SU-1) area abandoned chemical scrubbers and associated foul air duct and supports. Demolish existing foul air ducts for PS 6 and PS 6A and Junction Boxes 1E and 1F including associated support and axillaries. Relocation of 18 and 24 drain lines from discharging to the PS 6 middle flume to manhole S-MH-069. Electrical and Instrumentation and control improvements at influent junction boxes 1E and 1F.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 823885 | Published 5/13/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208