This posting has been archived
Roberto R. Bustamante Wastewater Treatment Plant Digesters 1, 2, and 3 Covers amd axers Rehabilitation Project – Bid Package 2 – Digester 1, El Paso
- Owner Reference
- RFEI
- Bid Date
- Sep 25, 2024 at 02:00pm
- Pre-Bid
- Scheduled - 9/11/2024 @ 10:00am @ (for location please or )
- Owner
- El Paso Water Utilities (EPWater) TX
- Trades
- Demolition Contractor, Building Moving, Wrecking: General Engineering Contractor or General Building Contractor, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Cementations Coating Systems, Recoating & Seal Coating or Sealings, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Bonds required. Prevailing wages.
Contact
- Kenneth Kincaid
- [email protected]
CBS ID: 721800 | Published 9/11/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.