South of the Brazos Water Line Connection to Greatwood – CWA2508, Sugar Land, TX
- Owner Reference
- 2026-ITB-015
- Bid Date
- May 21, 2026 at 11:00am
- Questions Due By
- May 8, 2026, 5:00pm
- Pre-Bid
- Scheduled, Optional - 5/5/2026 @ 02:00pm @ (for location please or )
- Owner
- City of Sugar Land
- Trades
- Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station
- Phase
- New Construction, Addition, Expansion
Description
560 LF 12-inch water line connecting from an existing 12-inch water line at the southeastern intersection of Magnolia Trail Ln. and Maple Harvest Ln. to the existing 12-in water line at the intersection of Magnolia Trail Ln. and the Brazos Regional Wastewater Treatment Plant Access Road.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 819985 | Published 4/20/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208