Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#825827 Posted 5/25/2026

CWA2406/2409: Groundwater Plant Generator & Right Angle Drive (RAD) Maintenance Program, Sugar Land, TX

Bid Date
Jun 4, 2026 at 11:00am
Questions Due By
May 21, 2026, 5:00pm
Pre-Bid
Scheduled, Optional - 5/14/2026 @ 11:00am @ (for location please or )
Owner
City of Sugar Land, TX
Trades
Generator Contractor: Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems, Watercraft: Nautical Boats, Ferries, Pontoons, Barges & Ship Repair; Vessel Drydocking, Hull Repairs & Modular Float Systems, Waterproof & Weatherproof Services, Other Foundation, Structure, & Building Exteriors NAICS 238190, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Supervisory Control & Data Acquisition (SCADA): Real-Time Data Utility Automation, Controllers/Timing, Remote Terminal Unit RTUs, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
New Construction, Addition, Expansion

Description

For Sugar Creek Water Plant, the scope of work includes the installation of a new diesel generator with a base fuel tank, along with a Service entrance rated Automatic Transfer Switch (ATS) and a dual-purpose docking station. The contractor shall also furnish and install a new incoming service bus weatherhead per CenterPoint Energy Standards, including all required supports, fittings, terminations, and weatherproofing/sealing, and shall coordinate any and all required outage and service reconnection to provide a complete, code-compliant service entrance installation. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. PLC/SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls).

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 825827 | Published 5/25/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208