Moses Lake Stormwater Pump Station, Houston, TX
- Owner Reference
- ITB 2026-020
- Bid Date
- Jun 2, 2026 at 11:00am
- Pre-Bid
- Scheduled, Optional - 4/29/2026 @ 03:00pm @ (for location please or )
- Owner
- City of Texas City, TX
- Trades
- Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's)
- Phase
- New Construction, Addition, Expansion
Description
The City of Texas City is requesting bids for the Moses Lake Stormwater Pump Station. This project involves the installation of a high-capacity stormwater pump station intended to pump water from Moses Lake into Galveston Bay. Moses Lake and Galveston Bay are separated by a USACE hurricane protection levee that encircles a large majority of the City of Texas City. The proposed pump station would have a total capacity of 136,000 gallons per minute, using the four (4) engine-driven stormwater pumps and four (4) diesel engines, and accessories purchased by the City as part of a separate project.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825828 | Published 5/25/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208