ARWA Carrizo System Expansion - GMP 1 & GMP 2, Maxwell, TX
- Owner Reference
- 2026-01
- Bid Date
- Jun 4, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 5/14/2026 @ 10:00am @ (for location please or )
- Owner
- Alliance Regional Water Authority, TX
- Trades
- Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Water Well Construction, Watershed Improvements & Water Tables Aquifer Storage, Drilling, Installation & Repairs, Drilling, Boring, & Blasting Contractor: Horizontal Directional Drilling (HDD), Other Earth Manipulation & Oil Field Work, Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's), *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
Description
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 826307 | Published 5/27/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208