#819902
Live Oak County Courthouse Phase II Restoration & Rehabilitation, George West, TX
Description of Alterations Work A. Scope of demolition and removal work is indicated on drawings and specified in Section 024100. B. Scope of alterations work is indicated on drawings. C. Plumbing: Alter existing and add new construction. D. HVAC: Replace existing system with new construction, keeping existing in operation until ready for changeover. E. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation. F. Fire Suppression Sprinklers: N/A this phase. ______. G. Fire Alarm: Alter existing system and add new construction, keeping existing in operation. H. Telephone: Alter existing system and add new construction, keeping existing in operation. I. Security System: Alter existing system and add new construction, keeping existing in operation.
Post Date: 04/20/2026
Bid Date:
05/28/2026
Trades: Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's, Fire Sprinkler Systems: Fire Suppression, Hydrostatic Testing, Water Sprinkler Systems for Building Safety, Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), Fire Protection: Fire Alarm, Smoke Detection & Fire Suppression Contractor, Fire Extinguishers, Pumps, Hydrants & Inspections, Security System: FOB, Access Control, CCTV, Video Surveillance, Active Threat, Intrusion Alarms (Except Locksmiths) NAICS 561621