Brookhaven Storm Sewer Rehab Phase II, Spring, TX
- Owner Reference
- R310600.37
- Bid Date
- Jun 4, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 5/22/2026 @ 11:00am @ (for location please or )
- Estimate
- $370,000
- Owner
- Montgomery County DD6 Drainage District #6, TX
- Trades
- Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Rehabilitation of the existing 48-in CMP using Cure in Place Pipe (CIPP) method. Including removal and replacement of existing inlets.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 826314 | Published 5/27/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208