This posting has been archived
Upper Harris Branch Wastewater Interceptor - Phase 1, Austin, TX
- Owner Reference
- IFB 6100 CLMC1132
- Bid Date
- Sep 25, 2025 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 8/12/2025 @ 10:00am @ (for location please or )
- Estimate
- $28,681,030.00
- Owner
- City of Austin TX
- Trades
- Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station, Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Rodding, French Drains, Dewatering, Water Swales, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sand Bags, Tree Service Contractor: Planting/Trimming/Pruning Trees, Stump Removal/Rooting/Tub Grinding, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Construction Zone Traffic Control Contractor, Flashing Beacons
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Bonds required. Prevailing wages.
Contact
- Ria-Fidelas Yamaguhi
- [email protected]
CBS ID: 777386 | Published 8/12/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.