Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#799146 Posted 12/9/2025

Hill Lane Wastewater Interceptor Phase 1 & Phase 2, Austin, TX

Owner Reference
IFB 6100 CLMC1086
Bid Date
Jan 8, 2026 at 02:00pm
Pre-Bid
Scheduled, Optional - 12/17/2025 @ 10:00am @ (for location please or )
Estimate
$12,805,000.00
Owner
City of Austin TX
Trades
Pipeline Contractor: Water Mains, Sewer Mains, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Rodding, French Drains, Dewatering, Water Swales, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
New Construction, Addition, Expansion

Description

4,200 feet of 36-inch wastewater interceptor from E. U.S. 290 north along Gilleland Creek to Hill Lane, 4,450 feet of 30-inch wastewater interceptor from the 36-inch wastewater interceptor west along Hill Lane to N. SH 130, and 4,720 feet of 24-inch wastewater interceptor from the 30-inch wastewater interceptor west across N. SH 130 and then north along Gilleland Creek to E. Howard Lane.

Bonds required. Prevailing wages.

Contact

CBS ID: 799146 | Published 12/9/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.