#828239
Campus Gateway to Student Success (CGSS) COB 4th Floor Finish Out., Tyler, TX
This solicitation is for the Campus Gateway to Student Success (CGSS) COB 4th Floor Finish Out. Includes major trades for 24,508-SF of the 4th floor interior renovation for existing building for bid and award.
Post Date: 06/09/2026
Bid Date:
06/23/2026
Trades: Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors