Browse all Val Verde County, TX
RFQ for Design-Build Services for the Buena Vista Pool Rehabilitation Project for the City of Del Rio, Del Rio, TX
The City is seeking Statements of Qualifications (SOQs) from qualified engineering and architectural consultants for evaluation, design and construction phase services, related to the rehabilitation of the Buena Vista Swimming Pool located at 1300 Kings Way in Del Rio, Texas 78840. The selected firm will provide evaluation, design, and construction services, including demolition of the existing pool and related infrastructure. The new pool must be constructed of reinforced pneumatically applied concrete, with slip-resistant concrete decks, playscapes, interactive water features, and/or slides. All work must comply with applicable Texas Administrative Codes and standards.
SOURCES SOUGHT RFQ Repair/Upgrade HVAC System, Area A, Building 320, Del Rio, TX
Total Small Business Set-Aside, 238220 - Plumbing, Heating, and Air-Conditioning Contractors. The project will focus on Area A, which is comprised of Air Handler Units (AHU) AHU-2 and AHU-6, and their respective ducting systems, Variable Air Volume (VAV) boxes, and supporting systems. The existing building utilizes Siemens and Johnson Controls Direct Digital Control (DDC) systems. The work includes, but is not limited to, providing all materials, labor, tools, and equipment for the demolition, removal, disposal, installation, and commissioning of the new HVAC system components as specified in the design. The contractor will be responsible for protecting existing infrastructure and ensuring the remainder of the facility remains operational during construction.
RFQ for the Del Rio Northside Sewer Line Project - Phase I, Del Rio, TX
Silver Lake WWTP Improvements Project, San Antonio, TX
The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Remove existing aeration equipment and replace with new disc aerators, add additional aerators, make structural modifications to support new aeration equipment and modify effluent weir box. 2. Remove existing chlorine disinfection equipment and replace with new chlorine disinfection equipment including scales, feeders, regulators, booster pumps and associated piping. 3. Replace existing clarifier no. 3 influent piping to improve hydraulic efficiency. 4. Replace electrical service entrance switchgear and construct new electrical motor control center for new and future equipment. 5. Construct various concrete slabs, canopies and enclosures for supporting and protecting equipment. 6. and other Work indicated in the Contract Documents. TBA on the Final Bid date.