Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#822333 Posted 5/5/2026

Live Oak Full Depth Rebuild, Hutto, TX

Owner Reference
IFB# 2026-040-RC-05
Bid Date
May 20, 2026 at 10:00am
Questions Due By
May 13th 2026, 5:00 PM CDT
Pre-Bid
Scheduled, Optional - 4/29/2026 @ 10:00am @ (for location please or )
Owner
City of Hutto
Trades
Construction Zone Traffic Control Contractor, Flashing Beacons, Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS), Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The City of Hutto, a home rule municipality, is soliciting sealed bids from qualified contractors for furnishing all labor, materials, and equipment for the full depth rebuild of Live Oak Street located in Hutto, TX. The contractor is required to make a field visit prior to submitting bids to verify dimensions, site conditions, verify quantities, and provide traffic control plan necessary to perform work. The Traffic Control Plan shall be sealed by a Professional Engineer Registered in the State of Texas as required by the City Engineer prior to starting work. Base bid for Live Oak Street, total length to be reconstructed is approximately 3,050 linear feet by 22 linear feet (LF), between Park Street going west shortly past West Street. Alternate bid A) for East Metcalfe Street and West Metcalfe Street, total length to be reconstructed is approximately 1,601 LF by 22 LF, between West Street going east towards FM 1660., and between FM 1660 going east to Church Street Alternate bid B) for Hutto Street, total length to be reconstructed is 1,720 LF by 22 LF, between Whitfield Street going east towards FM 1660. Alternate bid C) for Liberty Street and Church Street, total length to be reconstructed is 1,870 LF by 22 LF, Liberty Street from Whitfield Street going east to East Street Church Street from FM 1660 going east to Pecan Street The scope of work for all locations includes removing 7 inches of asphalt, base and subgrade, replacing with 5 inches of Type B hot mix asphalt and 2 inches of Type D hot mix asphalt, and associated traffic control, cleanup, and compliance with city specifications. Construction is expected to be completed within 90 calendar days of Notice to Proceed.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 822333 | Published 5/5/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208