ID 19071

Date Of Advertisement From Apr 12, 2024 to May 31, 2024

Summer Construction, Inc.

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, DVBE, UDBE, MBE, WBE, SBE
sub-contractors and/or material suppliers for the following project:

Reference: 07-352304 / ACPTIM-0053(113)E
CT 07-352304 Route 5 Replace Drainage Systems, Install GSRD, and Relace Sand Shed, Castaic, CA
In Los Angeles County In And Near Castaic From 0.5 Mile North Of Lake Hughes Road To 0.5 Mile North Of Vista Del Lago Road
Located in Los Angeles County, CA

Owner: Caltrans Headquarters Sacramento (CADOT) CA

Bid Date:  05/01/2024 at 02:00pm

We are requesting bids for the following trades and/or material suppliers:

LEAD COMPLIANCE PLAN, PLACE HOT MIX ASPHALT DIKE (TYPE F), DEVELOP WATER SUPPLY, REMOVE ASPHALT CONCRETE DIKE, CONSTRUCTION AREA SIGNS, JOINTED PLAIN CONCRETE PAVEMENT, TRAFFIC CONTROL SYSTEM, (F) - MINOR CONCRETE (MINOR STRUCTURE), TEMPORARY TRAFFIC STRIPE (PAINT), REMOVE RETAINING WALL (LF), CHANNELIZER (SURFACE MOUNTED), GROSS SOLIDS REMOVAL DEVICE INCLINED SCREEN TYPE D, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, 15" REINFORCED CONCRETE PIPE, TEMPORARY BARRIER SYSTEM, 24" REINFORCED CONCRETE PIPE, TEMPORARY CRASH CUSHION MODULE, 18" CORRUGATED STEEL PIPE (.079" THICK), JOB SITE MANAGEMENT, 24" CORRUGATED STEEL PIPE (.079" THICK), STORMWATER POLLUTION PREVENTION PLAN, 36" CORRUGATED STEEL PIPE (.079" THICK), STORM WATER SAMPLING AND ANALYSIS DAY, 42" CORRUGATED STEEL PIPE (.079" THICK), TEMPORARY HYDRAULIC MULCH, 24" STEEL FLARED END SECTION TEMPORARY COVER, 42" STEEL FLARED END SECTION, TEMPORARY FIBER ROLL, 36" PRECAST CONCRETE PIPE MANHOLE, TEMPORARY SILT FENCE, ABANDON CULVERT (LF), TEMPORARY CONSTRUCTION ENTRANCE, REMOVE PIPE (LF), STREET SWEEPING, REMOVE INLET, TEMPORARY CONCRETE WASHOUT, CLEANING, INSPECTING, AND PREPARING CULVERT (LF), TREATED WOOD WASTE, 24" CURED-IN-PLACE PIPELINER, CLEARING AND GRUBBING (LS), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROADWAY EXCAVATION, ROCK SLOPE PROTECTION FABRIC (CLASS 8), ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION) (V-DITCH), ROADWAY EXCAVATION (TOPSOIL), (F) - MISCELLANEOUS IRON AND STEEL, ROCK EXCAVATION, MANHOLE FRAME AND COVER, (F) - STRUCTURE EXCAVATION (RETAINING WALL), INLET FRAME AND GRATE, TRENCHLESS CULVERT INSTALLATION, 6' CHAIN LINK GATE (TYPE CL-6), DITCH EXCAVATION, TREATMENT BEST MANAGEMENT PRACTICE MARKER, ROADSIDE CLEARING, OBJECT MARKER (TYPE P), PLANT (GROUP A), OBJECT MARKER (TYPE R) PLANT ESTABLISHMENT WORK, REMOVE ROADSIDE SIGN (WOOD POST), WOOD MULCH ROADSIDE SIGN - TWO POST, TEMPORARY IRRIGATION SYSTEM, ALTERNATIVE IN-LINE TERMINAL TL-3, DRY SEED (SQFT), REMOVE GUARDRAIL, ROLLED EROSION CONTROL PRODUCT (NETTING), RECONSTRUCT GUARDRAIL, CLASS 3 AGGREGATE BASE (CY), 6" THERMOPLASTIC TRAFFIC STRIPE, LEAN CONCRETE BASE , REMOVE 6" TRAFFIC STRIPE, HOT MIX ASPHALT (TYPE A), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, RUBBERIZED HOT MIX ASPHALT (GAP GRADED), BUILDING WORK, PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE E), MOBILIZATION****

Bid documents can be viewed at or obtained from:

http://ppmoe.dot.ca.gov/des/oe/weekly-ads/plans.php?id=07-352304 and http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=07-352304

 Summer Construction, Inc. will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages. Please also refer to Caltrans new Spec Section 2-1.11 IN-USE OFF-ROAD DIESEL-FUELED VEHICLE LIST. Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Summer Construction Inc. requirements. Subcontractors will be required to sign the standard Summer Construction, Inc. Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner and throughout the entire timeframe of the project (530 working days) after NTP.

Summer Construction, Inc.
P.O Box 30
Santa Paula, CA 93061

Phone: (805) 933-9364  Fax:
Email: summer.construction@hotmail.com
Sam Bennett

Published Apr 12, 2024 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: 1-888-786-9450 Fax: 209.772.3573

This solicitation Ad will be archived 30 days after the bid date