ID 498423
Archived
Pierce County
Owner Reference: 9446
Bid Date: 06/05/2019 at 11:00am
Estimate: $7.5M -$10.0M
UDBE goal 13%; apprentice utilization requirement 15%. F.A. No. STBG-NHPP-0302(011)(012) on SR 302 MP 10.70 to MP16.87. Temporary stream diversion systems, TESC, dewatering, clearing & grubbing, structure, roadway and channel excavation, construction of a detour road and temporary bridge, temporary illumination systems, shoring, removing the existing culverts, constructing a prestressed concrete girder bridge, installing precast reinforced concrete split box culverts, backfilling, soldier pile and structural earth walls, temporary walls, crushed surfacing base course, ADA compliant pedestrian ramp and accessible signals retrofit, induction loop replacement, polyester concrete overlay, bridge deck repair and expansion joint modification, HMA, planing, pavement marking, permanent signing, guardrail, stream bed restoration, seeding, soil amendment, traffic control and other work. 312 working days.
Washington State Department of Transportation, WA
Michele Britton
(360) 874-3000
Login or create an account To view email
Published 05/07/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.