ID 499331
Archived
King County
Owner Reference: 2018-107
Bid Date: 06/05/2019 at 02:00pm
Estimate: $582,000
Scope includes replacement of existing timber bulkhead at CSO Outfall 171 with fiber reinforced polymer (FRP) sheet pile, steel soldier piles and waler, and cast-in-place concrete bulkhead; replacement of a portion of the existing CSO outfall with 36-inch-diameter reinforced concrete pipe, precast concrete vault, check valve and all appurtenances; construction stormwater pollution prevention; temporary sewer bypassing; dewatering; demolition and site preparation; excavation, backfill and compaction and; handling and disposal of site soils and debris.
City of Seattle, Public Utilities
Jessica Guerrette
(206) 779-5196
Login or create an account To view email
Published 05/15/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.