ID 503007
Archived
Contra Costa County
Owner Reference: POR-GRN
Bid Date: 07/18/2019 at 02:00pm
Pre-Bid: 06/20/2019
Corner of El Portal Dr & Church Lane.
Estimate: $500,000
Installation of landscaped stormwater filtration facilities (bioretention swale) and connection to existing stormdrain facility, removal of existing striping/signs and installation of class IV bike lanes, bike box, traffic signs and etc., update adjacent ADA curb ramps, and reconfiguration of the El Portal Drive and Fordham Street traffic signal timing for the bike box.Bonds required. Prevailing wages.
City of San Pablo, Public Works, CA
Jessica Rivas
(510) 215-3060
(510) 231-0223
Login or create an account To view email
Published 06/15/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.