ID 508667

Archived

RFP: Correctional Facility Relocation Department GMP 13.04 Project, Salt Lake City, UT

Salt Lake County

Owner Reference: 15310113 MW20008

Bid Date: 09/05/2019 at 12:00pm

Pre-Bid: 08/15/2019
Job Site Trailers 8000 West 1480 North, Salt Lake City, UT

Estimate: $12,000,000

The State of Utah Division of Facilities, Construction and Management is inviting Statements of Qualifications for all labor, tools, equipment, and expenses to construct the following; Schedule A: Sewer Pump Station 1 A sewer pump station including a grinder vault, two wet wells, a dry pump well, a portable generator, a pigging launch building, and a water flushing building. Schedule B: Sewer Headworks A sewer screening facility for a sewage leaving the USCF including a below ground vault and an above ground building. Schedule C: Water Pump Station and Storage Tanks Two 1.5 million gallon concrete above ground water storage tanks and a drinking water pump station including metering, drinking water pump, an on-site chlorination station, and a fire pump. Bonds required. Prevailing wages apply.

State of Utah Division of Facilities Construction & Management, DFCM UT

Mike Ambre
 (801) 209-9104
 Login or create an account To view email

Published 08/09/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.